Update on Badger 18 December 2014

Posted by on Dec 18, 2014 in Blog | 0 comments

Badger November 2014Badger is now fully fitted both inside and out, all that remains to be done is to have the new floor covering fitted inside the main cabin, a final touch up of the external paintwork, the sign writing to be applied followed by her final boat safety scheme inspection. She will be ready for launch on 24th January 2015 and we would like to take this opportunity to wish everyone a happy Christmas and peaceful New Year.